PV Panels rail Mounting Aluminum Rail

FOB Reference Price:Get Latest Price
US $2.75-2.8 / Set | 50 Set/Sets Aluminum Rail (Min. Order)
Supply Ability:
50000 Set/Sets per Month Aluminum Rail
Port:
Xiamen
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Fujian, China (Mainland)
Brand Name:
SF
Model Number:
SF-PFS
Specification:
Normal
Application:
Home
Output Voltage (V):
220V
Load Power (W):
Depend
Solar Power (W):
300W
Work Time (h):
24 Hours
Aluminum Rail:
Solar Panels Mounting Aluminum Rail
Material:
Aluminum&Stainless Steel Aluminum Rail
Certificate:
AS/NZS1170.2
Warranty:
10years
Packing:
case, pallet, carton, or customised Aluminum Rail
Packaging & Delivery
Packaging Details
Aluminum Rail packaging:
wood case. wood pallet, carton, or customer required

Solar Panels Mounting Aluminum Rail

SolarFirst    Products  Specifications See Below>>

Type

Roof mount

Installation Site

Rooftop

Structural Materials

Aluminum

Survival Wind Speed

60m/s

Design Snow Load

1.4KN/m2

System Tilt Angle 

10-45°

Module Orientation

Vertical or Horizontal

Design Standard

AS/NZS 170

Life

Design life is 25years, qaultity assurance for 10years

Delivery time

1 weeks for roof solar mounting

Package

 Carton, Wooden Pallet for solar mounting

SolarFirst        Product     Details        See Below>>

SolarFirst      System  Applications    iSee Below>>

SolarFirst   Solution  Advantages     See Below>>

 

1.Easy Installation

 

Pre-assembly mount system with professional design enable to save your time and money on site.

Quick and easy installation is promised due to our patented Cross-module, rail and roof hooks. 

 

2.Application

 

 

Roof hooks are available for most types of tile and asphalt shingle roofs, besides, flexible for low, medium and heavy snow load installation area.

 

3.High Compatibility

 

 

Compatible with various of solar panel in the market.

 

4.Innovative Design

 

 

With mechanical optimization and high density design, to minimizeloadingspace,highlevelofcorrosionresistancetreatment.

 

5.Strictly Quality Control

 

 

From selection of raw materials, procurement and production process, Solar First has a strict control process to ensure the ground mount structural strength and to optimize service life of system and Strict QC offers more reliable solutions with quite long life span.

SolarFirst          Factory&& Office        See Below>>

  SolarFirst    Packaging  DetailsDetaiSee Below>>

SolarFirst        Solar  Fair  Show SolarSee Below>>

SolarFirst                 FAQ                 See Below>>

In order to help you get the right system, please offer the following necessary info.,
1. The dimension of the solar panel: _________(L*W*T)
2. The roof type, and it's better to provide the pictures of roof: __________
3. The overall size of the PV array:____________
4. The order quantity for us to confirm delivery and shipping

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

p>